pictures for damp

to carry out a chemical injection you must take up the floor boards after hacking back to the brickwork at least a meter in height, drill into the course below the original dpc and insert the rods, you must also drill the bricks at the internal rise, up to a meter in height

carry out the process outside the property and lower ground levels if required then re-plaster inside to spec